Industrial plant upgrade on Complete Copper Infrastructure

Food & logistics production site · Midlands, UK · 2024

An industrial site refreshed ageing plant connectivity with a complete Hyperspan copper stack — from backbone and industrial Ethernet routes through to work-area outlets and organised racks.

4

Plant zones refreshed

3.2 km

Industrial Ethernet routes

↓ 40%

Mean fault-find time

Challenge

Mixed legacy cable types, incomplete documentation and harsh plant routes made upgrades risky and slowed fault-finding across production and cold-store areas.

Solution

A Complete Copper Infrastructure approach standardised Core™ and Industrial™ cable, Rack™ panels, labelling conventions and patching across refreshed zones, with environmental jackets matched to cold and outdoor industrial routes.

Outcome

Faster commissioning, clearer as-built records, and a single manufacturer pathway for support and warranty — with industrial Ethernet routes that tolerate the plant environment.

The biggest win was standardisation. Once the plant was on one copper stack with clear labelling, our maintenance team could diagnose issues without guessing which legacy cable they were looking at.

Mark T. · Controls & Networks Lead, Site engineering team

Project gallery

Warehouse aisle with industrial CCTV coverage
Warehouse operational monitoring
Industrial site network context
Hyperspan Industrial Ethernet cabling

Representative composite profile for illustration. Imagery shows typical Hyperspan deployment contexts; quotes and metrics are template project feedback pending approved client publication.