Skip to content
HYPERSPAN

About Hyperspan

Case Studies

Project showcases where Hyperspan copper systems simplify topology, reduce mid-span hardware, and support cleaner installs across campus, security, industrial and commercial environments.

Multi-building campus pathways and edge connectivity

Campus & Education

North West England · 2025 · Hyperspan XR

Multi-building campus backbone simplified with Hyperspan XR

A multi-building campus cut intermediate cabinets and active mid-span hardware by designing longer copper channels with Hyperspan XR for CCTV, ANPR and estate Wi-Fi edge nodes.

6

Intermediate cabinets removed

280 m+

Longest validated PoE channel

140+

Edge devices on XR copper

Read case study →
Smart commercial building edge systems

Smart Buildings

Greater London · 2025 · Hyperspan Core

Smart building structured cabling with Hyperspan Core

A commercial smart-building fit-out used Hyperspan Core Category systems for high-density horizontal cabling with clear testing, CPR alignment and a single warranty pathway.

1,200+

Work-area outlets

Cat6A

Category system

25-year

Warranty pathway

Read case study →
Warehouse aisle with industrial CCTV coverage

Warehouse & Industrial

Midlands, UK · 2024 · Complete Copper Infrastructure

Industrial plant upgrade on Complete Copper Infrastructure

An industrial site refreshed ageing plant connectivity with a complete Hyperspan copper stack — from backbone and industrial Ethernet routes through to work-area outlets and organised racks.

4

Plant zones refreshed

3.2 km

Industrial Ethernet routes

↓ 40%

Mean fault-find time

Read case study →
Perimeter CCTV cameras covering a commercial site

CCTV & ANPR

South East England · 2025 · Hyperspan XR

Perimeter CCTV and ANPR on extended-reach copper

A logistics park replaced fibre converters and PoE injectors on long camera runs with Hyperspan XR, powering perimeter cameras and ANPR gates from the security control room.

86

Camera / ANPR endpoints

22

Mid-span injectors removed

310 m

Longest outdoor channel

Read case study →
Stadium exterior with perimeter security and access

Stadiums & Events

Northern England · 2025 · Hyperspan XR

Stadium bowl and event overlay with deployable XR reels

A multi-use stadium used Hyperspan XR deployable reels for temporary bowl cameras, commentary positions and event overlay networks — then recovered the same infrastructure for the next fixture cycle.

48

Temporary XR runs / event

↓ 30%

Average build time

Venue-owned

Reusable kit ownership

Read case study →
Healthcare facility corridor and campus pathway

Healthcare

Scotland · 2024 · Hyperspan Core

Healthcare estate horizontal cabling with Core and CPR control

A hospital campus phase standardised on Hyperspan Core for horizontal and riser copper, with CPR classes and documentation matched to healthcare specification requirements.

900+

Outlets in phase

Per route

CPR classes controlled

Tested & filed

Handover packs

Read case study →

Profiles above are representative project composites for illustration. Have an approved client story? Contact us to publish a Hyperspan case study with project photography and quotes.