Skip to content
HYPERSPAN
Open Frame 4-Post 42U

Product photography is Hyperspan Rack™ / Power™ studio imagery matched to this cabinet, PDU or accessory family.

Open Frame4-postBlack

HSP-RACK-OF-4P-42U

Open Frame 4-Post 42U

HSP-RACK-OF-4P-42U is a 42U Hyperspan Rack open frame. It is a 4-post frame. There are no doors or side panels. 19-inch EIA-310 rails, numbered in U, are fitted front and rear. It is supplied flat-packed for assembly on site. Typical use: Lab / staging racks. Anchor the frame to the floor before it is loaded.

Key features

  • 42U of 19-inch mounting
  • 4-post open frame
  • Numbered EIA-310 rails, front and rear
  • Black powder-coated steel
  • Supplied flat-packed for site assembly

Technical data

Product code
HSP-RACK-OF-4P-42U
Cabinet
Open frame
Rack units
42U
Frame
4-post
Mounting
19-inch EIA-310
Rails
Front and rear, numbered in U
Material
Steel
Finish
Black powder coat
Supply
Flat-packed
Application
Lab / staging racks
Warranty
Product warranty; 25-Year System Warranty applies to qualifying registered Hyperspan channels
Order the Cabinet Baying Kit →
Log in as a partner or distributor, or register, to view pricing

Saved to your BOM on this device. Partner login to keep it as your order basket and export a PDF.

Documents are generated in the same branded PDF style as other Hyperspan downloads. Confirm certified DoP / CoC revisions with Hyperspan Technical Support for live projects and regulatory submission.

Flat-pack build

How this cabinet goes together

It is supplied flat-packed for assembly on site. The numbered drawing matches the parts in the pack and the assembly manual.

EXPLODED ASSEMBLYNumbers match the parts list123456

Parts

  1. 1BaseFloor member. Anchor this before the frame is loaded.
  2. 2Front postsFront pair of uprights.
  3. 3Rear postsRear pair of uprights.
  4. 4Top frameJoins the posts and squares the frame.
  5. 5Front 19-inch railsEIA-310 pair on the front posts.
  6. 6Rear 19-inch railsEIA-310 pair on the rear posts.

Build sequence

  1. 1.Unpack and check the base (1), front posts (2), rear posts (3), top frame (4) and both rail pairs (5 and 6).
  2. 2.Fix the front and rear posts to the base.
  3. 3.Fit the top frame and square the diagonals before you tighten it.
  4. 4.Fit the front rails and the rear rails to the same equipment depth.
  5. 5.Anchor the frame to the floor, then load the equipment. This frame has no doors or side panels.

Before you start

  • Use two people. A tall cabinet or frame is not a one-person lift.
  • Wear gloves. Flat-pack steel edges are sharp.
  • Assemble on a level floor, with room to square the frame.
  • Leave the frame fixings finger-tight until the diagonals match, then tighten.
  • Do not load equipment until the rails are fitted and the cabinet is in its final position.
  • A published static load is a standing load. Do not roll a loaded cabinet.
  • Bond the frame to earth before any PDU or active equipment is energised. The earth bonding kit is a separate accessory.
  • Baying kits, plinths, castors, fan trays, blanking panels and M6 cage nuts are ordered separately.